Scheduling Inspections

Scheduling Inspections

Inspections are scheduled in advance by calling the office at 860-684-1775 and while every effort is made to accommodate requests, same-day requests are usually difficult. Please plan appropriately so that the project is not held up waiting for inspections. 

LIST OF REQUIRED INSPECTIONS BY PROJECT TYPE                                                                        

The following is a list of typical inspections required by project type. Please note that the following list is based on the most common inspections required but may vary based on specifics of each project. A list of required inspections is listed on each issued permit. If you are unsure whether a particular inspection is required, please contact the Building Official for verification. Note that the inspections below do not include inspections that may be required by wetlands, zoning and town sanitarian. Please contact each office to discuss what their required inspections are.

New House

  • Footing inspection prior to concrete
  • Foundation/ Rebar inspection prior to concrete
  • Damp proofing
  • Footing drain
  • Pre slab poly vapor barrier
  • Under slab plumbing if applicable ( DWV water pressure test required)
  • Rough framing
  • Ice and water and seam tape prior to roof shingles
  • Electrical trench
  • Rough electrical
  • Rough plumbing ( includes DWV water pressure test and water line air test)
  • Gas line pressure test and trench if applicable
  • Insulation
  • Final C/O

Foundation Replacement

  • Preconstruction meeting onsite ( septic and well must be identified)
  • Footing inspection prior to concrete
  • Foundation/ Rebar inspection prior to concrete
  • Damp proofing
  • Footing drain
  • Pre slab poly vapor barrier
  • Under slab plumbing ( DWV water pressure test required)
  • Final C/O

Interior Renovation - Residential

  • Rough framing
  • Rough electrical
  • Rough plumbing ( includes DWV water pressure test and water line air test)
  • Gas line pressure test and trench if applicable
  • Insulation
  • Final COC

Electrical Service Panel Upgrade

  • Final after panel install complete. Panel cover must be off and electrician on site during inspection

Mechanical system replacement/ upgrade

  • Final after install complete

Generator

  • Trench if applicable
  • Gas pressure test
  • Final after install complete. Panel cover must be off and electrician on site during inspection. A transfer test will be performed.

Solar Installation

  • Trench if applicable
  • Final after installation complete. Electrician/ technician must be onsite. All boxes must be open and panel cover must be off for inspection.

Above ground pool

  • Pool bonding
  • Trench
  • Final ( pool alarm and ladder must be installed)
  • Additional inspections required if deck is attached.

Inground Pool

  • Pool bonding
  • Trench
  • Patio wire mesh/ rebar bonding
  • Trench and pressure test if pool heater installed
  • Final ( pool/ door alarm and barrier must be installed)

Roof Replacement

  • Ice and water and seam tape prior to shingles
  • Final

Deck

  • Piers/ footings prior to pouring concrete
  • Framing inspection prior to installing decking
  • Final

Commercial construction new/ renovation

  • Commercial inspections are job specific and will be identified on the permit and discussed with the contractor.