Route 190 Milling and Resurfacing
Group: Construction News
Project No. DOT01710478CN “H”
Headline: Milling and Resurfacing Project, Route 190 Stafford from Route 30 (Crystal Lake Road) to Route 32 (Monson Road).
Teaser:
The Connecticut Department of Transportation is announcing that a milling and resurfacing project will be performed on Route 190 Stafford Route 30 (Crystal Lake Road) to Route 32 (Monson Road).
Body of the Message
The project DOT01710478CN “H” consists of milling and resurfacing a 2.48-mile segment of Route 30 (Crystal Lake Road) to Route 32 (Monson Road) in Stafford This project is scheduled to begin milling by Rafferty Fine Grading on Monday, September 12, 2022, to Friday, September 16,2022. The resurfacing segment of this project is anticipated to begin on Monday, October 3, 2022, to Thursday, October 13, 2022, by All States Asphalt.
This project is included in the Department of Transportation’s 2022 Vendor Resurfacing Program.
LANE CLOSURE INFO/DETOUR INFO
Motorists can expect lane closures on Route 190 from Route 30 (Crystal Lake Road) to Route 32 (Monson Road) in Stafford. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is 7:00 a.m. to 5:00 p.m. (Monday – Friday).
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.
The information below must be filled in for press information to show up on map and website
Specific Date e-alert to be issued: 8/11/2022
NOT FOR PUBLICATION MAPPING ONLY
DOT Project No.: DOT01710478CN “H”
Route: 190
Town: Stafford
Highway log: 15.77 to 18.25
Go to http://www.ct.gov/dot/LIB/dot/Documents/dpolicy/hwylog/hwylog.pdf#40776
Project Start Date: 9/12/22
Anticipated Completion Date: 10/13/22
OW/OS Travel way Restrictions Information:
Lane Widths – x’, Shoulder Widths – x’, Height – x, Posted Weight – N/A
Ruth Burchard / cm
cc: James M. Chupas – Richard P. Reagan – Andrew S. Morrill
Eric Belanger - John D. Haggerty – Ron Gardner
Barry T. Julian – William Gombotz – Peter DiCesare
Britton Wilson –Chris Johnson – Starkel
Dave Wasik – Michael D’Angelo – Samuel Sondak – Andrew Becker
Daniel A. DiReinzo – Ruth Burchard – Steven Jamele – Michael Mennella – Pete Hollister
Donald L. Ward
Project File (DOT01710478CN “H”)